Industrial Water Transmission Pipelines

Industrial Water Pipeline for Bithnok Thermal Power Project

Technical consultancy services for construction of a 40 km water pipeline from Girajsar Distributory of Dr. Karni Singh Lift Canal (IGNP) to the 1x250 MW NLC Bithnok Thermal Power Project site.

CompletedFrom Girajsar Distributory (IGNP) to Bithnok Site, Bikaner, Rajasthan
Authority / Client Context
NLC India Limited (NLC Bithnok)
Sector & Category
Industrial Water Transmission Pipelines (Industrial & Environmental)
Estimated Scheme Capital Value
Rs. 10.71 Cr.
Documented Status
Completed (03.03.2017)

Capital Expenditure Notice: Project values mentioned on this website represent the estimated capital expenditure of the respective public and industrial infrastructure schemes and do not represent the consultancy fees or annual revenue of M. R. Agraulic Experts.

Engineering Consultation

Discuss a Similar Water or Infrastructure Scheme

Whether you require DPR preparation, hydraulic survey, turnkey bid documentation, or third-party design review, our technical team is ready to consult.